Back to Blog
Concurrent engineering examples6/13/2023 ![]() ![]() As a result, Toyota may take more time early on to define the solutions, but can then move more quickly toward convergence and, ultimately, production than its point-based counterparts. A wide net from the start, and gradual elimination of weaker solutions, makes finding the best or better solutions more likely. “set-based concurrent engineering” (SBCE) begins by broadly considering sets of possible solutions and gradually narrowing the set of possibilities to converge on a final solution. Toyota embrace this concept in the way that they do product development using a system they develop called Set Based Concurrent Engineering - SBCE I came across a different aspect of the Toyota system, reading the excellent article by Barry O’Reilly - “Optimise to be wrong, not right” in which he explores the concept of running multiple concurrent small experiments, most of which are like to go nowhere however provide a massive upside when one unexpectedly pays off. There are many excellent books on how Toyota runs their systems - The Machine that Changed the World and The Toyota Way are two well worth checking out. Deming and Taiichi Ohno and refined over many deliberate years of improvement. ![]() Their methods are based on various concepts developed by W. Toyota has had an incredible impact on global industry, inventing a vertically integrated manufacturing method that has seen it become the number one car manufacturer.
0 Comments
Read More
Leave a Reply. |